The new EW Wald AG headquarters in Wald (ZH) is a showcase for modern Building-Integrated Photovoltaics (BIPV), combining a total PV capacity of 120 kWp with architectural design. Custom PV solutions are integrated into the roof, façades, terraces and railings, including distinctive green photovoltaic façade modules matching the company’s identity. The Minergie-certified building demonstrates how solar technology can become an integral and visually attractive part of modern architecture.
Jonastrasse 12, 8636 Wald ZH
Keller & Kuhn AG, Markus Rüfenacht
2023
BIPV (Glass/Glass with frames)
79 m2
The new EW Wald AG headquarters in Wald (ZH) was completed in March 2023 after approximately one and a half years of construction. The building is certified according to the Minergie standard and features a photovoltaic system with a total capacity of 120 kWp.
Designed as a showcase for modern renewable energy solutions, the project integrates photovoltaic components throughout the building envelope – on the roof, façades, terraces and railings. A particularly distinctive feature is the use of custom-designed green PV modules on the façade, matching EW Wald’s corporate colour.
The project required highly customised solutions, as standard components could hardly be used. Particular attention was given to module design and mounting, fire safety, Minergie requirements and architectural integration.
The photovoltaic system is complemented by battery storage, EV charging stations and an intelligent load management system, allowing the generated electricity to be used efficiently on site. With offices, warehouse facilities and a showroom, the headquarters also serves as a demonstration building where different BIPV and sustainable energy solutions can be experienced under real operating conditions.
EW WALD AG. Commercial/industrial building
Text sources: https://www.solarmarkt.ch/de/referenzen/bipv-projekt-ew-wald
Foto: